A look inside CertMinder UK

See how CertMinder UK works — before you sign up.

Everything below is a read-only example built with realistic UK sample data, styled exactly like the real app. Nothing here is editable and no account is created.

1. Your Dashboard

Example — read-only

At-a-glance stat cards, the upcoming deadlines list with traffic-light badges, and the latest UK legislation updates — so the first thing you see every morning is what needs doing today.

Good morning, Neil

Properties

7

Valid

18

Expiring

4

Expired / overdue

2

Upcoming deadlines

  • Gas Safety (CP12)

    12 Elm Road, Bristol

    Overdue 4 days
  • RRA Information Sheet

    44 Kingsway, Leeds

    Overdue — max £7,000
  • EICR

    8 Waverley Court, Manchester

    Due in 21 days
  • EPC

    2A Priory Lane, Sheffield

    Due in 58 days
  • Gas Safety (CP12)

    9 Meadow View, Nottingham

    Valid — 9 months left

Legislation updates

  • Renters' Rights Act Information Sheet — deadline passed

    Existing tenants had to be served by 31 May 2026.

  • MEES consultation: minimum EPC C proposed for PRS

    Government response expected later this year.

  • Awaab's Law extension to the PRS

    Damp and mould response timescales under review.

2. A Property in detail

Example — read-only

Every property has three sections: certificates (gas, EICR, EPC, PAT, alarms), tenancy obligations (Right to Rent, How to Rent, deposit, licensing, the RRA Information Sheet) and Property Care — good-practice checks kept clearly separate from the legal traffic-lights.

Property

12 Elm Road, Bristol BS3 4TT

Tenant: J. & P. Ahmed

Certificates

TypeIssuedExpiresStatus
Gas Safety (CP12)14 Aug 202514 Aug 2026Valid
EICR02 Jun 202202 Jun 2027Valid
EPC11 Sep 201611 Sep 2026Due in 51 days
PAT test10 Jan 202510 Jan 2026Expired 193 days

Tenancy obligations

  • Right to Rent check completed

    Completed 04 Mar 2026

    Done
  • 'How to Rent' guide served to tenant

    Completed 04 Mar 2026

    Done
  • Deposit protected + prescribed info given

    MyDeposits — 07 Mar 2026

    Done
  • Licensing (HMO / selective)

    Not required

    Done
  • RRA Information Sheet served to tenant

    Was due 31 May 2026 — penalty up to £7,000

    Overdue

Property Care

Good-practice — kept separate from legal

Optional checks that protect the property and keep tenants happy.

  • Annual boiler service

    Every 12 months · last done 18 Oct 2025

    Next: 18 Oct 2026
  • Property inspection

    Every 6 months · last done 12 Jan 2026

    Next: 12 Jul 2026
  • Damp & mould check

    Every 6 months · last done 12 Jan 2026

    Next: 12 Jul 2026
  • Gutter clearance

    Every 12 months · last done 22 Oct 2025

    Next: 22 Oct 2026

3. Reminders — email and SMS

Example — read-only

Choose how you want to be reminded and when. Email reminders are free on every plan. SMS is available as an extra backup reminder on Pro and above. Phone push notifications are coming soon.

Never miss a deadline — reminders by email and text.

Reminders send at 60, 30, 14, 7 and 0 days.

Email reminders

Sent from CertMinder UK to the address on your account.

neil@example.co.uk

Phone notifications (push) — coming soon

Push notifications straight to your phone are coming soon. For now, use email and SMS reminders.

SMS text remindersPro

An extra text reminder alongside email, so important deadlines are harder to miss.

07700 900123

Reminder days

60 days before30 days before14 days before7 days beforeOn the day

4. Professional PDF compliance pack

Example — read-only

Turn everything CertMinder UK tracks into a branded PDF you can hand to an agent, lender or council in seconds.

CertMinder UK

Compliance Pack

12 Elm Road, Bristol BS3 4TT

Generated 22 Jul 2026

Gas Safety
EICR
EPC
PAT test

Not legal advice — reflects records as of the generated date.

One click generates a professional, branded PDF for a single property or your entire portfolio. It includes:

  • A branded cover page with the property address, tenant and date generated.
  • A RAG (red/amber/green) summary of every certificate and obligation.
  • The uploaded certificate documents merged in after the summary.
  • A short disclaimer footer on every page.

Hand it to an agent, lender, mortgage broker or council with zero back-and-forth. On the Agency plan, packs can be white-labelled with your own logo instead of the CertMinder UK brand.

5. Getting the work actually done

Tracking a deadline is only half of it. CertMinder UK runs the job from the moment you raise it to the moment the invoice reaches your accounts.

  • Contractors work from a link

    No login and no app. They open their job page, accept the work, propose appointment slots and upload their invoice when they're done.

  • Tenants confirm the time

    The tenant sees the proposed slots on their own page and confirms or declines, adding any access notes.

  • You see the whole thread

    Proposed times, declines, notes and the confirmed appointment all sit on the work order — no chasing either side for an update.

  • Urgency and spend control

    Tag a job routine, ASAP or urgent with a target completion date. Anything above your spend threshold waits for your approval; you set the threshold and can override it per job.

  • A real tenant app

    The tenant's link keeps working, opens on any phone and can be added to the home screen like an app — no download. They can report an issue with a photo, and it arrives as a work order for you to review rather than going straight to a contractor.

  • Your branding, not ours

    On agency plans your logo, name and accent colour appear on the tenant app, the contractor job page and your PDF packs. Everything defaults to the CertMinder UK brand until you customise it.

  • Xero draft bills

    Completed jobs push into Xero as a draft bill with the contractor's invoice attached and the contact matched or created. If the attachment can't be added, the bill carries a link instead.

  • Bulk document upload

    Drop in a folder of PDFs — CertMinder UK reads the filenames and addresses, works out the certificate type and files each one against the right property.

  • Branch reporting for agencies

    Multi-branch agencies get a league table by compliance score, expired count and property count, plus a branded PDF branch report showing properties, certificate status and open jobs.

  • Care and hazards too

    Fire risk assessments, property hazards and good-practice checks like boiler services and damp inspections sit alongside the legal certificates, kept clearly separate.

CertMinder UK doesn't just keep you legal — it helps you be the landlord tenants want to stay with.

Property Care sits alongside your legal compliance so you can schedule the things that protect the property and look after tenants: annual boiler service, periodic inspections, damp & mould checks, leak checks, gutter clearance and any custom check you want to add. Available on every plan.